This 10,000 square foot facility was constructed as a dusign/build project. We worked closely with the owner to meet their requirements for the building. Construction was started mid-September and was completed by the end of November to hold their Christmas stock.
Economy Wheels was a design/build project that required following the Nissan Design Criteria. Working closely with Wes Surdyka Architect we were avle to meet NIssan's requirements. The new building was constructed while their existing facility on the same site remain operational. Economy Wheels was able to maintain their existing business whit minimal disruption while their new building was constructed.