Potholing

Project Activity Posts

Harvest Utility Potholing Finished

Posted by: C Below | Sep, 23rd

Project: Harvest Utility Potholing

C Below potholed (19) locations that were specified by the client.  Per the cities specifications, a hot patch was required and removal of all Dig Alert marks.  Traffic control was provided by C Below.

Photo for project
Read more about this Project

Portola Parkway Potholing Completed

Posted by: C Below | Sep, 23rd

Project: Portola Parkway Potholing

C Below located all utilities in two predesignated areas that was defined by the client.  Two boring locations were also cleared on the property.  (9) pothole locations and (1) trench was performed to verify existing utilities.  Traffic control was provided by C Below.

Photo for project
Read more about this Project

Sierra Ave. Potholing Completed

Posted by: C Below | Sep, 23rd

Project: Sierra Ave. Potholing

C Below potholed (20) locations that were specified by the client.  Traffic control was provided by C Below.

Photo for project
Read more about this Project

Projects

Diamond Bar USD

Lobeer Middle School

Subsurface-Imaging

Camp Pendleton

Replacement Hospital

Subsurface-Imaging

Westminster USD

Warner MS, Stacey MS, Johnson MS

Subsurface-Imaging

Subsurface-Imaging

Coyote Trail Potholing

San Bernadino County Dept. of Public Works

Subsurface-Imaging

Hook Creek Rd. Potholing

Cedar Glen, California

Subsurface-Imaging

Subsurface-Imaging

Irvine Valley College

Irvine, California

Subsurface-Imaging

North Sky River Substation Addition

California City, California

Subsurface-Imaging

Site-Utilities

Portola Parkway Potholing

Lake Forest, California

Subsurface-Imaging

Harvest Utility Potholing

Rancho Cucamonga, California

Subsurface-Imaging