Ground Penetrating Radar • Utility Locating • Concrete X-Ray • Mapping • Video Pipe Inspection • Potholing
C Below potholed (19) locations that were specified by the client. Per the cities specifications, a hot patch was required and removal of all Dig Alert marks. Traffic control was provided by C Below.
C Below located all utilities in two predesignated areas that was defined by the client. Two boring locations were also cleared on the property. (9) pothole locations and (1) trench was performed to verify existing utilities. Traffic control was provided by C Below.
C Below potholed (20) locations that were specified by the client. Traffic control was provided by C Below.
Subsurface-Imaging