Stew Leonards Grocery Store on the Berlin Turnpike in Newington, CT was a challenging reformation project of an abandoned Caldor Department store that began in the Fall of 2006. With a non-negotiable deadline, our framers, carpenters, and drywall finishers had to deliver quality while under stringent time constraints. Our organization was called upon to transform a building with structural idiosyncrasies and a constantly changing design criteria, into a 120,000 s.f. state of the art Stew Leonards grocery store. Our employees completed the exterior canopy framing including installing a Lancaster dome onto a silo constructed by our framers. The exterior and interior plywood sheathing, interior drywall, metal framing, acoustical ceilings, and doors and hardware were completed by our skilled employees. Our carpenters were critical in the sucessful construction of this project. They exemplified the many values of our organization. Our employees were professional, cooperative, responsive, and solution driven with a proactive attitude. The Stew Leonards project was one of the most enjoyable and rewarding projects that our company has ever been fortunate enough to be a part of.
In cooperation with KBE Building Corporation, Complete Interior Systems Inc, completed the metal stud framing, drywall, and FRP at the Besito Restaurant. The drywall finishing in particular was labor intensive in that we were called upon to trowel a stucco styled finish to the majority of the walls, columns, and soffits. The goal accomplished by our carpenters and drywall finishers, was to achieve a look, style and feel of a rustic southwestern mexican atmosphere. Over 100 2' x 2' arched openings were constructed symmetrically on one wall spanning 63 feet by 20 feet in height. Under the constraints of allowable space given the size and nature of the project, Complete Interior Systems Inc, was able to complete its work due to the professionalism, skill, and patience of its employees, the leadership and guidance of KBE Building Corporation, and the cooperation of all other trades involved in the project.
Keystone Companies LLC of Avon, CT called upon Quisenberry-Arcari Architects and Construction Services of Somerset, the general contractors of the Stonebridge Estate project, to build 16 luxury condominiums that were 2 bedroom residences that required the utmost standard of quality for drywall finishing. As the projects drywall contractor, Complete Interior Systems Inc, skilled craftsmen installed over 120,000 square feet of gypsum board, completed miscellaneous metal stud furring and framing and installed acoustical ceilings at the garage area. Our drywall finishers provided quality workmanship while under the constraints of construction scheduling. The project completed in the Fall of 2008 is within walking distance of West Hartford's Center and Blue Back Square.
Complete Interior Systems Inc, is a Woman owned Minority Business Enterprise and is licensed with the State of Connecticut Small Contractor's Set-Aside Program. Complete Interior Systems Inc, takes pride in its attention to detail and is dedicated to completing quality construction while strictly adhering to safety and construction deadlines. As a full service drywall company, specializing in metal stud framing, drywall, acoustical ceilings, and the installation of doors and hardware our reputation is based on quality and customer satisfaction.