Grand Rapids, Michigan
Electrical-Engineering
WPF Engineering provided lighting design and electrical engineering for this high end tenant fit out. 9th and 10th floors of the City Bank building in downtown Grand Rapids were renovated as office, conference space and lobby spaces.
Designed to LEED silver certification for commericial interiors this space achieved a reduction of lighting density by 25% while still achieving a dramatic lighting affect. In addition controllability of lighting systems point was achieved by allowing all employees to control lighting level in their space to further reduce energy and provide comfort to occupants.
PP-CST-095E-581B-ABCC-EC3C-2
Status: Completed
@Mentions:
General-Contractor
Sustainable Mechanical Design Associates
Mechanical-Engineering
Electrical-Engineering
Interiors-Contractor
Supplier
Electrical-Contractor
Worked on this project?
Add it to your portfolio