Toronto, ON
Newmarket, ON
structural-engineering
This 165,000 square foot six-storey office building is connected to Southlake Regional Health Centre at third floor by a pedestrian bridge.
The foundation is designed as a raft slab covering entire building footprint to compensate for poor soils conditions. The fourth floor and part of the third floor are upgraded to control vibration for surgical requirements.
PP-CST-C559-16BD-982E-FD63-0
Status: Completed
Project Credits:
Worked on this project?
Add it to your portfolio