Mississauga Executive Centre

Mississauga,, ON

structural-engineering

Story

Rehabilitation projects at this commercial development have included tenant revisions, load reviews, the replacement of rooftop mechanical units, repairs of the concrete decks, waterproofing, asphalt repairs, expansion joint repairs and thin waterproofing repairs. Work included a full condition survey and rehabilitation design of the underground parking garage in four buildings located at 1, 2, 3 and 4 Robert Spec Parkway. The structures required a waterproofing replacement at the decks, deck joints, and deck rehabilitation and localized repairs to the underground waterproofing system and expansion joints.

Original structural engineering design for the development was also completed by Stephenson Engineering in the 1970’s.

Facts

  • Title: Mississauga executive centre
  • Location: Mississauga,, on
  • Phase: Complete


Project Identification Number:

PP-CST-51AF-C348-6D67-2BD8-0


Status: Completed


Tags

  • other
  • restoration
  • small-projects


Project Credits:

Stephenson Engineering

structural-engineering


Worked on this project?

Add it to your portfolio