Toronto, ON
Toronto, ON
structural-engineering
Stephenson Engineering executed the removal and replacement of joint sealant at precast-to-precast concrete panels, perimeter-of-window frames, and metal-to-metal window frame joints, as well as the interfacing of glazing to metal window frames. To meet budget restraints the work was phased over two years, with Phase 1 completed in the summer of 2013 and Phase 2 scheduled to be completed in the spring of 2014.
PP-CST-B186-B7D5-BA22-AB87-0
Status: Completed
@Mentions:
Worked on this project?