Steel Supply & Engineering

Grand Rapids, Michigan

Project Activity Posts

Calvin College Spoelhof Fieldhouse Complex Finished

Of the approximately 1250 tons of structural steel on this project, the main feature was the two structural steel trusses in the arena area. When fully assembled, each weighed a total of 103 tons and spanned over 200 feet. Due to their weight, the fabrication of these trusses occurred outside at Steel Supply and Engineering. Each truss was pre-assembled in its entirety to assure proper fit-up once it was delivered to the project site. Each truss was shipped in three separate pieces. Splice plates up to nine feet long were utilized to fit the three truss pieces together. Due to the magnitude of the trusses and the number of holes that occur at each splice, the fit-up at SS&E was a critical part in assuring the success of the project. Many hours of internal planning and design by SS&E took place in order to accomplish this project.

Not to be overlooked, are the eleven structural steel trusses spanning the new swimming pool. These were fabricated in two sections due to shipping restrictions. The web configuration and overall layout and arched bottom chord proved challenging in the detailing and fabrication process. Special care also had to be taken during fabrication as these trusses are one of the main architectural features of the project.

Budget $5,900,000

Supervision Jason Bosscher, Clay Poe, Mitch Van Houten.

Photo for project
Read more about this Project

One Haworth Center (HQ Renew) Finished

Photo for project
Read more about this Project

Meijer Gas Stations Finished

Posted by: Steel Supply & Engineering | Sep, 23rd

Project: Meijer Gas Stations

Project Name:

Meijer 2008 National Account

Tonnage:

600

Square Footage:

1,3666,000

Contract Amount:

$5,700,000

P roject cost

$120,000,000

Arch/Eng:

FTCH

GC/CM:

Rockford Construction Company

Contact Name:

Tom McGovern

Contact Number:

(616) 285-6933

Completion Date:

March 2008

Project Description:

Fabricated and erected the structural steel for six Meijer super centers in Michigan, Illinois and Indiana of approximately 156,000 square feet to 215,000 square feet per store – 1,366,000 total square feet

 

Read more about this Project

Projects

Campbell Insurance Headquarters

Caledonia, Michigan

Misc.-Metal-Fab.

Structural-Steel-Fabrication

Steelcase University Learning Center

Grand Rapids, Michigan

Structural-Steel-Fabrication

JW Marriott

Grand Rapids, Michigan

Structural-Steel-Fabrication

Structural-Steel-Fabrication

Structural-Steel-Fabrication

Gentex-State Street Addition

Zeeland, Michigan

Structural-Steel-Fabrication

Williamston High School

Williamston, Michigan

Structural-Steel-Fabrication

SYSCO Foods Cooler/Freezer

Grand Rapids, Michigan

Structural-Steel-Fabrication

Peckham Greenhouse

Lansing, Michigan

Misc.-Metal-Fab.

Meijer

Grandville, Michigan

Structural-Steel-Fabrication

Spectrum Health Tunnel

Grand Rapids, Michigan

Structural-Steel-Fabrication

Pennfield High School

Battle Creek, Michigan

Structural-Steel-Fabrication

John Ball Zoo - African Lion Exhibit

Grand Rapids, Michigan

Misc.-Metal-Fab.

Misc.-Metal-Fab.

Cathedral Square

Grand Rapids, Michigan

Structural-Steel-Fabrication

Helen DeVos Children's Hospital

Grand Rapids, Michigan

Structural-Steel-Fabrication

Misc.-Metal-Fab.

Turtle Creek Casino & Hotel

Williamsburg, Michigan

Structural-Steel-Fabrication