University of South Florida - Joint Military Leadership Center Completed

  • Design and build a facility to bring the three ROTC programs (Army, Navy and Air Force) under a common roof. The facility will be a 4-story building.
  • 53,709 total square footage with an occupant load of 1,254 people.
  • The 2nd floor auditorium contains 223 seats expandable to 367 seats.
  • The 2 lecture halls on the first floor will each be 195 seats.
  • State of the art audiovisual system, utilizing videoconferencing and distance learning.
  • Classrooms for both USF and the ROTC programs.
  • Office spaces for Army, Naval and Air Force ROTC programs.
  • Weapons Simulator Training Room.


"...I need to express my sincere appreciation for the superb job Mr. Bob Ruhl has done as your General Superintendent for this project...... My staff and I are filled with gratitude for your professionalism, assistance, and commitment to making C. W. Bill Young Hall a reality........."
        - Acting Executive Director, University of South Florida

Key Personnel:
Principal in Charge, Joseph J. Kokolakis
Executive Director, Roderick Voigt
Project Manager, Justin Granholm
Superintendent, Robert Ruhl
Assistant Superintendent, Danial Krajacic

Photo for project
Read more about this Project

Thomas Jefferson Library - West Point Military Acadamy Completed

  • A new six-story state of the art Library and Learning Center, with a full basement, located in the heart of West Point's academic community.
  • It serves as a resource center for all Army Cadets and West Point Faculty members, and was designed to provide enhancement and diversification to the learning environment.
  • The facility consists of two learning center components, the Center for Enhanced Performance, and the Center for Teaching Excellence, strategically located within 140,000 square feet of usable space.
  • Numerous support service areas, stack areas, reading and quiet study areas, offices, media rooms, and classrooms are provided.
  • A concrete spiral staircase is located just inside the hall's main entrance, and winds its way from the basement to the sixth floor lobby.
  • The construction methodology applied to this project incorporates a number of logistical and operational constraints, and proactive planning and sequencing of deliveries, work activities, and coordination of trades is essential.
  • Its proximity to fully operational buildings, sports arenas and heavy Cadet traffic required strict safety measures and clear access to be maintained at all times.


Key Personnel:
Principal in Charge, Joseph J. Kokolakis
Project Manager, Arthur Gureck, Jr.
Superintendent, Butch Mulligan & Micky McMahon

Photo for project
Read more about this Project