Plainwell, MI/Tolleson, AZ
Electrical Contractor
For more than 50 years, JBS has been the largest animal protein processor in the world with 140 production facilities. This project was a multi – temperature distribution facility attached their plant via a 300 foot temperature controlled conveyor bridge.
Following the successful project in Plainwell, JBS had another building in need of a plant attached to the distribution facility just outside of phoenix, however this time it was directly attached with no conveyor bridge.