Contractor
Herndon, Virginia
Brightview Dulles Corner – Herdon Independent Living, Assisted Living, Memory Care 13700 Magna Way, Herdon, VA 20171 Located in Northern Virginia, the new Herndon Senior Living Community features over 190 apartments ranging from independent living, assisted living and memory care apartments. With multiple outdoor gardens, fireplaces and recreational spaces available to the residents, there was a wide range of landscape features installed in order to create a quite and serene environment in a vibrant urban area. Hundreds of trees and shrubs and thousands of perennials were planted throughout the grounds. A bocce ball court and dog park were installed to expand the programming of this space. This 230,000 SF building reaching 7 stories has multiple open spaces over structure and outliving living areas that we all designed and planted with individual themes to take in account the varying climatical and environmental needs of each plant community. The public park, also part of the Dulles Corner’s design, covers the below-grade parking deck, serving to foster intergenerational activity and interaction. By focusing on community-building and activation, residents remain more active and involved in the local community. Type of Construction: • Design/Build, Class A, multi-tenant, 7-story independent assisted living • 230,000 overall construction footprint Landscape Construction Features: Scope of work and Landscape Construction Features: * Installation of Plant materials and mulch at building and in various parks - 80 Mature Trees - 250 Landscape shrubs - 2,600 Perennials and groundcovers * Soil Excavation and Installation - Excavated and hauled over 250 CY of soil - Installed over 2,100 CY of lightweight soil over structure * Artificial turf – 8,085 Sf - Turf panel for recreation - Dog Park Installation - Bocce ball Court Installation * Irrigation - 12 Station Irrigation system with over 8,500 LF of drip line * Silva Cell installation - Installed 2,592 CF of Silva Cell Structures * Side furnishing at building, park, and wellspring amenity space * 110 Yards of Mulch Installed * Over 140 specialty chairs and benches from 6 vendors throughout the U.S. * Bike racks, trash receptacles and custom planters furnished and installed throughout the grounds *Playground installation over an underground parking garage Overall Size of Project: • 5.2 Acres of construction and development Contract Value: • $1,500.570 Length of Landscape Construction Project: • 11 Months total [September 2021 – August 2022] Percentage of Work Self-Produced • 80% of work was self-performed.
Contractor
@Mentions: