Koury Engineering & Testing, Inc. is a consulting engineering firm where superior and personalized service becomes the model others strive to achieve. Koury Engineering's disciplined business approach allows us to effectively provide professional engineer
This maintenance facility is designed for servicing of rail cars. The railway will travel up a riser to provide under carriage access to rail cars to provide routine maintenance.
The U.S. General Services Administration and Clark-Atkinson are partnering to begin construction of the San Ysidro Land Port of Entry’s East-West pedestrian bridge. This 806-foot-long bridge is the first phase of GSA’s planned expansion and renovation of the port. The new bridge will connect the existing transit plaza on San Ysidro Blvd. to the west side of Interstate 5 on the north side of Cam iones Way. It is designed to meet new security measures and will better serve the port’s pedestrian traffic. Construction activities currently underway include pile driving, demolition, underground utilities, concrete and steel work, painting and landscaping. Construction is expected to last approximately 18 months. Koury Engineering is providing Materials Testing for this project.
Scope: Provided material inspections and testing services for historical restorations and new construction.
Completed Project: Harvard Westlake Middle School - Provided inspection and testing on a new academic building, a library/science building, parking, and cooling towers on 180,000 sq.ft that included concrete shotcrete, concrete post tension, rebar, masonry, fireproofing, steel fabrication shop and steel welding. Conducted non-destructive ultrasonic and magnetic particle examinations.