Featured

Project Activity Posts

San Ysidro Border Station Pedestrian Bridge Finished

The U.S. General Services Administration and Clark-Atkinson are partnering to begin construction of the San Ysidro Land Port of Entry’s East-West pedestrian bridge. This 806-foot-long bridge is the first phase of GSA’s planned expansion and renovation of the port. The new bridge will connect the existing transit plaza on San Ysidro Blvd. to the west side of Interstate 5 on the north side of Cam iones Way. It is designed to meet new security measures and will better serve the port’s pedestrian traffic. Construction activities currently underway include pile driving, demolition, underground utilities, concrete and steel work, painting and landscaping. Construction is expected to last approximately 18 months. Koury Engineering is providing Materials Testing for this project.

Photo for project
Read more about this Project

Projects

SR-22 HOV Lane Expansion

Orange, California

Inspection-Services

West Los Angeles College LACCD

Student Services Building
Culver City, California

Material-Testing

West Los Angeles College LACCD

General Classroom Building
Culver City, California

Material-Testing

Pierce College LACCD

Center for the Sciences
Woodland Hills, California

Material-Testing

LA Mission College LACCD

Health and PE Center
Sylmar, California

Material-Testing

LACMA Transformation Project

Los Angeles, California

Inspection-Services

Target Import Warehouse Project

Rialto, California

Material-Testing

LA Open Door Presbyterian Church

Los Angeles, California

Material-Testing

West Los Angeles College LACCD

Math and Science Building
Culver City, California

Inspection-Services

Inspection-Services

South Region Sr. High School No. 2

Los Angeles, California

Material-Testing