Grand Rapids, Michigan
Spring Lake, Michigan
General-Contractor
The Grand River Greenway project was a long-awaited addition to the Spring Lake Trail System incorporating the construction of a 3,000 foot boardwalk that weaves through the wetlands of Mill Point Park towards the panoramic Grand River. The project also includes five scenic overlooks, 16 boat docks and a kayak/canoe launch at the end of South Cutler Street in Spring Lake, MI.