Project Name: Muskegon Telemetry
Project Size: 500W
Location: Various Locations, Northern Michigan
Date of Installation: ’05 through present
Equipment Installed: Windemuller designed and installed dozens of small PV power stations to power telemetry at dozens of off-grid natural gas wells throughout Northern Michigan. Telemetry is sent via cellular back to production control.
Utility/Developer: No grid connection
Windemuller, Inc., developer