Project Name: Kent Intermediate School District
Project Size: 10kW PV Roof Array, 2.2kW PV Pavilion, and 2.4kW Wind Turbine
Location: Grand Rapids, Michigan
Date of Installation: September 2010
Equipment Installed: 2.2kW System: SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components
10kW System: Dual SMA 5000US inverters, REC 230 PV panels, roof mount array, connection to internet via Powerdash components
Wind Turbine: 2.4kW Skystream Wind Turbine grid connected.
Utility/Developer: Connected to Consumers Energy system
Windemuller, Inc. and Energy Works Michigan, developer
Performance Info: http://energyworksmichigan.powerdash.com/explore/