Electrical-Contractor
Project Name: Burt Township Schools
Project Size: 1.15kW wind turbine
Location: Grand Marais, Michigan
Date of Installation: June 2010
Equipment Installed: SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components. 2.4kW Skystream wind turbine was also installed by Windemuller
Utility/Developer: Connected to Alger-Delta system
Windemuller, Inc. and Energy Works Michigan, developer
Performance Info: http://energyworksmichigan.powerdash.com/explore/