THE KING CO., INC. contracted with the State of Michigan Department of Management and Budget to install limestone riprap at the Evart Trail Bridge in Evart, Michigan.  24-inch limestone riprap was placed at both abutments to be used as a scour preventive measure.  The limestone riprap was placed from both shore and water (using barge equipment) and keyed into the existing mudline.  

Facts

  • Title: Evart trail bridge
  • Location: Evart, michigan
  • Phase: Complete
  • Delivery method: Design-build
  • Budget: $900,000


Project Identification Number:

PP-CST-0E09-DC13-B9C0-34B1-0


Status: Completed