Toggle navigation
Your Projects
dashboard
Their Projects
Submissions Manager
Browse Project Portfolios
receipt
More
dashboard
Learn about PR News
Connect your Facebook Page
monetization_on
Pricing
question_answer
FAQs
aspect_ratio
API Developer Documentation
description
Terms & Conditions
exit_to_app
Login
supervisor_account
Signup
search
Browse Portfolios
supervisor_account
Sign in
Soils & Structures, Inc.
Muskegon, MI
Message
Follow Portfolio
Project folders
All
Commercial/Retail
Education
Healthcare
Housing
Industrial
Infrastructure
Municipal
Religious
Temporary Structures-Falsework
×
Concern
Become a Manager of this portfolio
Who built this portfolio?
Flag inappropriate content
Intellectual property concerns
Zeeland West High School - Pool & Gym Additions
Zeeland, Michigan
Material-Testing
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Picture of Zeeland West High School - Pool & Gym Additions
Story
This addition to the existing West High School building features a pool / aquatic center with entrance lobby and also includes a practice gymnasium.
The construction of the building varies. The pool area consists of rigid steel construction with barrel-vaulted trusses supporting continuous 145-foot curved standing-seam roof panels. The men’s and women’s locker rooms, a workout room, and pool support / mechanical rooms are located beneath the cast-in-place concrete bleachers. The practice gymnasium and lobby areas are conventional masonry-bearing construction.
The pool itself is slightly longer than
MHSAA
regulation at 119 feet by 75 feet (10 primary lanes, and 16 secondary lanes) and has a movable floating bulkhead that allows the 119-foot dimension to be partitioned to a regulation 33 1/3 meters x 25 yards and allow event equipment and associated markings to be easily reconfigured for different events or even to allow multiple events simultaneously. There are two (2) diving platforms on the west end. Scorekeeping and video systems are all state-of-the-art technology with a full motion high-definition video board.
In keeping with Zeeland’s sustainability design paradigm, there are energy recovery systems and the water temperature is regulated by tying in to the existing geothermal well system. There are also lucrative amounts of natural lighting protected by sun shades to match the existing structure.
Soils & Structures, Inc. provided geotechnical engineering and construction material testing for this project.
Facts
Title:
Zeeland west high school - pool & gym additions
Location:
Zeeland, michigan
Postal code:
49464
Phase:
Complete
Delivery method:
Construction management
Size:
73000.0
×
Add a Project Contributor
Who is the contributor?
remove
Company Name
remove
Person's Name
Role on the project
(ex: 'engineering', 'landscaping', 'programmer', 'supplier')
Small contribution
Medium contribution
Large contribution