Pioneer Construction was asked to take an existing facility that was over 20 years old and give it an entire face lift. All of the surface materials throughout the area were removed, the locker rooms, men’s and women’s, were gutted, resulting in an entire design for these areas. The biggest challenge facing the architect as well as Pioneer was to add a 20’ x 10’ steam room in the men’s locker room within the existing space. Pioneer and Grooch Design not only met this challenge but exceeded all expectations by creating additional walls and raising the level of the floor. the Health Facilities serve over 400 members as well as daily use by the guests of the hotel. The entire project took less than three months from start to finish.

Facts

  • Title: Amway grand plaza hotel health facilities
  • Location: Grand rapids, michigan
  • Postal code: 49503
  • Phase: Complete
  • Delivery method: Construction management
  • Budget: $350,000


Project Identification Number:

PP-CST-B387-448A-B8E2-FBD6-1


Status: Completed


Tags

  • hospitality


@Mentions:

Pioneer Construction

Construction-Management

Ritsema Associates

Interiors-Contractor


Worked on this project?

Add it to your portfolio