Power Systems Solutions

Coopersville, Michigan

North Ottawa Community Hospital

Electrical-Engineering

Story

Power Systems Solutions (PSS)provided the short circuit, coordination and arc flash study on this project.  It involved initial meeting with the electrical contractor, general contractor and owner to assist the contractor for proper field gathering of information.  Provided was the professionally created, stamped and sealed reports by Kevin J. Grimm PE.  The reports contained short circuit information, colored coordination curves, breaker capability analysis and arc flash report and also the three color arc flash labels.  Additionally PSS designed and supervised the installation of an entire new electrical service and generator supply system for complete hospital power.

Facts

  • Title: North ottawa community hospital
  • Phase: Complete
  • Budget: $400,000
  • Size: 10000.0


Project Identification Number:

PP-CST-A555-CFE3-77B5-75FC-1


Status: Completed


Tags

  • hospital
  • healthcare


Project Credits:

EV Construction

Construction-Management

Power Systems Solutions

Electrical-Engineering


Worked on this project?

Add it to your portfolio