Story

Power Systems Solutions provided the short circuit, coordination and arc flash study on this project.  It involved initial meeting with the electrical contractor, general contractor and owner to assist the contractor for proper field gathering of information.  Provided was the professionally created, stamped and sealed reports by Kevin J. Grimm PE.  The reports contained short circuit information, colored coordination curves, breaker capability analysis and arc flash report and also the three color arc flash labels.

 

Facts

  • Title: City of wyoming clean water plant - stage 2 improvements
  • Location: Wyoming, michigan
  • Phase: Complete


Project Identification Number:

PP-CST-EC0F-C758-86D1-D0AF-4


Status: Completed


Tags

  • water/waste-water-treatment
  • utilities


Project Credits:

Erhardt Construction

General-Contractor

Allied Mechanical Services

Electrical-Contractor

Burgess Concrete Construction

Concrete-Contractor

Power Systems Solutions

Electrical-Engineering