Storm water modification
Construct a new 35’ group II taxiway system parallel to runway 13-31
Construct a new 50’ group III taxiway system parallel to runway 5-23
Construct all new parallel taxiway tie-ins
Disable and enable NAV AIDS, signage and airfield lighting and install new wiring and conduit as required
Supply and install all retro-reflective markers
Supply and install guidance signs, bases and taxiway lighting
Upgrade and modify the existing electrical vault
Relocate the glide slope antenna
Remove NAV AID shed and install shed with new foundation
Sod/Seed and mulch disturbed areas