Houghton, Michigan
General-Contractor
This pre-engineered metal building was constructed to house Michigan Tech's backup generators. During power outages, the plant is able to create an adequate supply of power to maintain operations on all of campus, including the heating system. The project involved a significant amount of coordination between the electrician and Michigan Tech's heating system technicians.