Lake Linden-Hubbell School Renovations

Lake Linden, Michigan

General-Contractor

Story

Moyle Construction was the general contractor for the general renovations at the Lake Linden-Hubbell Elementary and High Schools.  New windows were installed in the old high school along with new wood window sills and trim.  All the interior doors were upgraded from the original wood doors to metal frames and solid core wood doors.  The auditorium was rewired for new lighting and the old glass block windows removed and new aluminum windows installed.  The old metal seats and original wood desks were removed, the floor resanded and sealed, and new, modern seating installed.  In the gymnasium, the perimeter balcony was removed on two sides and one side enlarged and replaced.  A new tongue and groove wood floor was installed on the new balcony and the entire balcony and wood gym floor was resanded, painted, and sealed.  New backboards, bleachers, and athletic equipment were installed.  The heating system throughout the entire building was upgraded to a modern, more efficient system.

Facts

  • Title: Lake linden-hubbell school renovations
  • Location: Lake linden, michigan
  • Postal code: 49945
  • Phase: Complete
  • Delivery method: Design-bid-build
  • Budget: $2,131,000


Project Identification Number:

PP-CST-DB1E-ED4C-5936-E3D9-0


Status: Completed


Tags

  • education
  • other


@Mentions:

Moyle, Inc.

General-Contractor


Worked on this project?

Add it to your portfolio