Bond Falls Flowage, Michigan
Design-Builder
Upper Peninsula Power Company required erosion control and upgrades to its recreational site at Bond Falls Flowage. Moyle Construction was hired to perform shoreline stabilization at several locations, installation of two boat landings, staking of live trees, and the building of eight sets of wooden steps from water elevation to higher ground to assist in prevention of further erosion.