Grand Rapids, MI
Surveying
EXXEL ENGINEERING provided construction staking of the site grades, utilities, drives, parking areas and sidewalks.
PP-CST-8D04-C902-7E4D-B77C-1
Status: Completed
@Mentions:
Paradigm Design
Architectural
EV Construction
Construction-Management
Exxel Engineering
Soils & Structures, Inc.
Material-Testing
Eyewood Design, Inc.
Cabinets-Installation
Worked on this project?
remove