Muskegon, Michigan
Roofing
We installed a fully adhered EPDM roof system over the concrete deck. There is an asphalt system vapor barrier and the insulation was set in hot asphalt.
The wind from the lakes was a challenge and we worked together with the General Contractor, Architect and all the other trades on site to get the job done safely and on time.