TAC Manufacturing :: Diecast Manufacturing Facility

Jackson, Michigan

Engineering

Story

TAC Manufacturing embarked on the construction of a new 64,000 sq. ft. zinc and magnesium die casting facility in order to increase their production capabilities. The new facility is a stand alone building, adjacent to the existing plant with independent utilities including a chilled water system, compressed air system, plumbing, HVAC, fire protection and electrical and exterior magnesium dust neutralization system. A new 3-ton bridge crane system was designed, and a second 3-ton bridge crane was relocated from the existing plant with a new runway beam. The new facility included one fully equipped loading dock, recess truck well for scrap dumpsters, receiving, maintenance, inspection, meeting rooms, lockers for 50 employees, and office areas.

Facts

  • Title: Tac manufacturing
  • Subtitle: Diecast manufacturing facility
  • Location: Jackson, michigan
  • Postal code: 49201
  • Phase: Complete
  • Budget: $ 3.5 million
  • Size: 57000.0


Project Identification Number:

PP-CST-BD38-878E-D203-0F50-0


Status: Completed


Tags

  • manufacturing-&-production
  • Industrial