Bell's Brewery

Galesburg, Michigan

Architectural

Story

With CSM Group acting as construction manager for this project, the constant-temperature cooler, which was completed in fall of 2005, is a pre-engineered metal structure with 4-inch thick wall panels and 6-inch thick roof panels. The panels are specially insulated with a polyurethane foam core sandwiched between 24-gauge steel.

This project also involved converting a portion of the existing cooler area into a new maintenance room, maintenance office, and dry storage. Plans also included the relocation of two shipping/receiving docks, and the construction of two new ones. A new small keg filler area was added and extra space for the maintenance shop was created as well.

In fall of 2005, Bell's Brewery broke ground on a 5500-square-foot fermentation area that will house the company's 12 new 400-barrel beer fermenters which, when complete, will double their production capacity to almost 120,000 barrels of beer annually.

Facts

  • Title: Bell's brewery
  • Location: Galesburg, michigan
  • Postal code: 49053
  • Phase: Complete
  • Budget: $1,900,000
  • Size: 47500.0


Project Identification Number:

PP-CST-27B9-3F1E-1175-608B-4


Status: Completed


Tags

  • other
  • Industrial


@Mentions:

Byce & Associates, Inc.

Architectural

CSM Group

Construction-Management

Hazelhoff Builders, Inc.

General-Trades

Burgess Concrete Construction

Concrete-Contractor

Kerkstra

Precast-Concrete


Worked on this project?

Add it to your portfolio