Fremont Public Schools :: Fremont High School

Fremont, Michigan

Glazing

Story

Overall project includes approximately 15,000 SF of aluminum curtainwall framing with 1" insulated glazing and/or insulated translucent panels by Kalwall along with tappered aluminum plate accent fins and sunshades custom fabricated by FC&A.  Project also includes 2-3/4" insulated translucent wall panel system with standard and radius top design at select locations around entire facility.  Architectural Glass & Metals worked with the design and construction team to refine material integration details as required to achieve design intent and maintain weather-tight integrity of each system provided.   

Facts

  • Title: Fremont public schools
  • Subtitle: Fremont high school
  • Location: Fremont, michigan
  • Phase: Complete
  • Green: Sustainable
  • Delivery method: Construction management
  • Budget: $40 million
  • Size: 192000.0


Project Identification Number:

PP-CST-7CEE-BA57-33AC-DCB3-2


Status: Completed


Tags

  • k-12
  • education
  • leed-certified


@Mentions:

Triangle Associates

Construction-Management

JDH Engineering

structural-engineering

Soils & Structures, Inc.

Material-Testing