general contractor
Eaton Rapids
The new playground equipment and PIP surfacing.
The southern boardwalk runs along the river's edge opposite of the island.
The northern boardwalk and surrounding landscaping.
Each boardwalk is equipped with a fishing pier extending into the river.
View of the island, bridge, and boardwalk from the main road.
The south end of the island.
A close up of the new retaining wall and park benches.
A closer view of the bridge materials and connecting retaining wall.
The upgraded steel pedestrian bridge connecting the east side of the island.
Swing set on the new playground.
G.A.R. Island Park received multiple renovations and additions that will last for generations to come. Included was a new steel bridge on the east side, new retaining walls to prevent flooding, a new playground with PIP surfacing, and new boardwalks equipped with fishing piers.
general contractor
@Mentions:
general contractor
Project Manager (Laux Construction)
Site Furnishings
Architect
Site Superintendent (Laux Construction)
Project Engineer (Laux Construction)
Project Manager Assistant (Laux Construction)
Surveying
Concrete Flatwork
Surveying
Masonry
Site Furnishings
Other Furnishings
Other Furnishings
electrical
Excavator
Steel fabricator
Wood Framing Materials
Site Furnishings
Asphalt