ABC - Western Michigan Chapter

Grand Valley State University, Daniel and Pamella DeVos Center for Interprofessional Health

Grand Rapids, MI

Story

The project consisted of 1,350 tons of structural steel working with multiple cranes. Five floors of steel were erected off of a post-tension podium. All moment connections were welded on site. Structural elements included a large skylight frame, 1” brick wedge, and large cantilevers at the fifth and first floor.

Facts

  • Location: Grand Rapids, MI
  • Postal code: 49504
  • Size: 166,270.0 SQ FT

@Mentions:

Pioneer Construction

Steel erector