Process Pipe Contractor
Grand Haven, MI
Allied Mechanical Services worked throughout the entire Grand Haven wastewater plant. This consisted of work in three separate buildings: the new construction headworks building, the existing primary sludge building, and the existing activated sludge building. The new headworks building including a triplex pump station, screening system, and grit removal equipment.