ABC - Western Michigan Chapter

South Christian High School

Byron Center, Michigan

Story

Our scope consisted of running the mechanical piping for the heating hot water systems, chilled water systems, natural gas main, and all snow melt piping. The chilled water system by summer 2018 so that gym floor installation and all work completed by December 2018 for second semester move-in.

Facts

  • Location: Byron Center, Michigan
  • Postal code: 49315

@Mentions:

Allied Mechanical Services

Mechanical Piping Contractor, Mechanical Piping Engineering