Fire Suppression Design and Installation
Zeeland, MI
This was a 350,000 square foot building with areas for production, storage, mechanical, training, and offices. The fire protection was fed by city water and boosted by an electric fire pump covering 6 wet and 1 nitrogen generated preaction system. Also containing 2 Ecaro dry chemical systems.
Fire Suppression Design and Installation
@Mentions: