Windemuller began in 1954 as an electrical contractor. While we still offer electrical services there are many other services that are offered. Our services include Automation, Communications, Information Technologies, and Outdoor Utilities. Windemuller h

Project Activity Posts

Muskegon Community Telemetry Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Muskegon Community Telemetry

Project Name:                Muskegon Telemetry Project Size:                   500W Location:                        Various Locations, Northern Michigan Date of Installation:     ’05 through present Equipment Installed:   Windemuller designed and installed dozens of small PV power stations to power telemetry at dozens of off-grid natural gas wells throughout Northern Michigan. Telemetry is sent via cellular back to production control. Utility/Developer: No grid connection Windemuller, Inc., developer  

Photo for project
Read more about this Project

Alma Middle School Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Alma Middle School

Project Name:                Alma Middle School Project Size:                   2.2kW PV Pavilion and 2.4kW Wind Turbine Location:                        Alma, Michigan Date of Installation:     December 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom pavilion structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components, 2.4kW Skystream wind turbine was also installed by Windemuller Utility/Developer: Connected to Consumers Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Allen Park Middle School Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Allen Park Middle School

Project Name:                Allen Park Middle School Project Size:                   2.2kW PV Awning Location:                        Allen Park, Michigan Date of Installation:     July 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to DTE Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Baraga Area Schools Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Baraga Area Schools

Project Name:                Baraga  Area Schools Project Size:                   2.2kW Location:                        Baraga, Michigan Date of Installation:     July 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Alger-Delta system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Detroit Community Schools Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Detroit Community Schools

Project Name:                Detroit Community Schools Project Size:                   2.2kW Location:                        Detroit, Michigan Date of Installation:     November 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom pavilion structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to DTE Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Burt Township Schools Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Burt Township Schools

Project Name:                Burt Township Schools Project Size:                   1.15kW wind turbine Location:                        Grand Marais, Michigan Date of Installation:     June 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components. 2.4kW Skystream wind turbine was also installed by Windemuller Utility/Developer: Connected to Alger-Delta system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Delton Kellogg High School Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Delton Kellogg High School

Project Name:                Delton-Kellogg High School Project Size:                   2.2kW Location:                        Delton, Michigan Date of Installation:     October 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom pavilion structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Consumers Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Detroit Edison Public School Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Detroit Edison Public School

Project Name:                Detroit Edison Public School Academy Project Size :                  2.4kW Wind Turbine, 2.3kW PV Solar Pavilion Location:                        Detroit Michigan Date of Installation:     May 2011 Equipment Installed:   SMA 3000US inverter, REC 230V PV panels, custom pavilion designed and installed by Windemuller, Davis weather station, Skystream 3.7 wind turbine, connection to internet via Powerdash components. Utility/Developer: Connected to DTE Energy Windemuller, Inc. and Energy Works Michigan, developer  

Photo for project
Read more about this Project

Forrest Park School Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Forrest Park School

Project Name:                Forest Park School Project Size:                   2.2kW Location:                        Crystal Falls, Michigan Date of Installation:     December 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Alger-Delta system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Gladstone High School Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Gladstone High School

Project Name:                Gladstone High School Project Size:                   2.2kW Location:                        Gladstone, Michigan Date of Installation:     June 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Alger-Delta system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Hudsonville High School Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Hudsonville High School

Project Name:                Hudsonville High School Project Size:                   1kW PV Awning and 2.4kW Wind Turbine Location:                        Hudsonville, Michigan Date of Installation:     September 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components. 2.4kW Skystream Wind Turbine Utility/Developer: Connected to Consumers Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Finished work for Kent I.S.D.

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Kent I.S.D.

Project Name:                Kent Intermediate School District Project Size:                   10kW PV Roof Array, 2.2kW PV Pavilion, and 2.4kW Wind Turbine Location:                        Grand Rapids, Michigan Date of Installation:     September 2010 Equipment Installed: 2.2kW System: SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components 10kW System: Dual SMA 5000US inverters, REC 230 PV panels, roof mount array, connection to internet via Powerdash components Wind Turbine: 2.4kW Skystream Wind Turbine grid connected. Utility/Developer: Connected to Consumers Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Norway-Vulcan High School Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Norway-Vulcan High School

Project Name:                Norway-Vulcan High School Project Size:                   2.2kW Location:                        Norway, Michigan Date of Installation:     December 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, roof mount system, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Alger-Delta system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

Ohio Department of Transportation Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Ohio Department of Transportation

Project Name:                Ohio Department of Transportation Project Size :                  40kW Wind Turbine Location:                        Toledo, Ohio Date of Installation:     April 2011 Equipment Installed:   40kW Tecwind Wind Turbine Utility/Developer: Connected to AEP grid Ohio Department of Transportation, developer  

Photo for project
Read more about this Project

Onsted High School Finished

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: Onsted High School

Project Name:                Onsted High School Project Size:                   1kW PV Awning and 2.4kW Wind Turbine Location:                        Onsted, Michigan Date of Installation:     November 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning designed and installed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to Consumers Energy system Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

St. Joseph Catholic School Completed

Screen_shot_2015-04-30_at_5.01.45_pm
Posted by: Windemuller | Jul, 24th

Project: St. Joseph Catholic School

Project Name:                St. Joseph’s Catholic School Project Size:                   2.2kW PV Awning Location:                        Wayne, Michigan Date of Installation:     June 2010 Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning designed and installed by Windemuller, Davis weather station, connection to internet via Powerdash components Utility/Developer: Connected to DTE Energy system, Green Currents Program Project Windemuller, Inc. and Energy Works Michigan, developer Performance Info: http://energyworksmichigan.powerdash.com/explore/  

Photo for project
Read more about this Project

No Public Activity Posts

Projects

Peninsula Bay Condo

Traverse City, Michigan

Electrical-Contractor

InterCare Community Health Network

Benton Harbor Facility
Benton Harbor, Michigan

Electrical-Contractor

Electrical-Contractor

Electrical-Contractor

Metro Health Southwest

Grand Rapids, Michigan

Electrical-Contractor

Bissell Innovation Center

Walker, Michigan

Electrical-Contractor

The Gallery on Fulton (UICA)

Grand Rapids, Michigan

Electrical-Contractor

Pellston Airport

Pellston, Michigan

Electrical-Contractor

Stoney Corners Wind Farm

McBain, Michigan

Electrical-Contractor

Electrical-Contractor

Flow Rite new facility

Byron Center, Michigan

Electrical-Contractor

International Bridge Security Upgrade

Sault Ste Marie, Michigan

General-Contractor

Electrical-Contractor

Electrical-Contractor

Electrical-Contractor

Electrical-Contractor

Controls-Contractor

Gourmet International Addition

Caledonia, Michigan

Electrical-Contractor

Tuscola ISD

Energy Works

Electrical-Contractor

Electrical-Contractor