Muskegon Community Telemetry Finished

Posted by: Windemuller | Sep, 23rd

Project: Muskegon Community Telemetry

Project Name:                Muskegon Telemetry

Project Size:                   500W

Location:                        Various Locations, Northern Michigan

Date of Installation:     ’05 through present

Equipment Installed:   Windemuller designed and installed dozens of small PV power stations to power telemetry at dozens of off-grid natural gas wells throughout Northern Michigan. Telemetry is sent via cellular back to production control.

Utility/Developer: No grid connection

Windemuller, Inc., developer

 

Photo for project
Read more about this Project

Alma Middle School Completed

Posted by: Windemuller | Sep, 23rd

Project: Alma Middle School

Project Name:                Alma Middle School

Project Size:                   2.2kW PV Pavilion and 2.4kW Wind Turbine

Location:                        Alma, Michigan

Date of Installation:     December 2010

Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom pavilion structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components, 2.4kW Skystream wind turbine was also installed by Windemuller

Utility/Developer: Connected to Consumers Energy system

Windemuller, Inc. and Energy Works Michigan, developer

Performance Info: http://energyworksmichigan.powerdash.com/explore/

 

Photo for project
Read more about this Project

Allen Park Middle School Finished

Posted by: Windemuller | Sep, 23rd

Project: Allen Park Middle School

Project Name:                Allen Park Middle School

Project Size:                   2.2kW PV Awning

Location:                        Allen Park, Michigan

Date of Installation:     July 2010

Equipment Installed:   SMA 3000US inverter, REC 230 PV panels, custom awning structure designed by Windemuller, Davis weather station, connection to internet via Powerdash components

Utility/Developer: Connected to DTE Energy system

Windemuller, Inc. and Energy Works Michigan, developer

Performance Info: http://energyworksmichigan.powerdash.com/explore/

 

Photo for project
Read more about this Project

Projects

InterCare Community Health Network

Benton Harbor Facility
Benton Harbor, Michigan

Electrical-Contractor

Electrical-Contractor

Adams Elementary School

Energy Works of Michigan

Electrical-Contractor

Electrical-Contractor

Tuscola ISD

Energy Works

Electrical-Contractor

Electrical-Contractor

Electrical-Contractor

Onsted High School

Energy Works

Electrical-Contractor

Electrical-Contractor

Kent I.S.D.

Energy Works

Electrical-Contractor

Electrical-Contractor

Gladstone High School

Energy Works

Electrical-Contractor

Forrest Park School

Energy Works

Electrical-Contractor

Electrical-Contractor

Delton Kellogg High School

Solar installation

Electrical-Contractor

Detroit Community Schools

Solar installation

Electrical-Contractor

Allen Park Middle School

Solar installation

Electrical-Contractor

Alma Middle School

Wind and Solar installation

Electrical-Contractor

Muskegon Community Telemetry

Solar installation

Developer