WPF Engineering was hired by Jeffrey Parker Architects, for electrical and lighting design.  This was a 12,000 SF addition and 8,500 SF renovation to what was an existing high school.  We transformed this school building into a functional space which includes a kitchen, café, large commons space for large events and gathering, green room, preschool rooms and other classrooms.  On the second floor adult classrooms and additional gathering space was provided overlooking the commons space below.   Beta Calco’s decorative lighting was utilized in the two story church commons space.  

The existing electrical service was relocated to the other side of the building requiring refeeding the entire facility.  The fire alarm system was replaced. 

Facts

  • Title: Riverside church - addition and renovations
  • Location: Three rivers, michigan
  • Phase: Complete
  • Delivery method: Design-bid-build
  • Budget: $2.5 million
  • Size: 12000.0


Project Identification Number:

PP-CST-A42A-205A-61EF-3B7F-0


Status: Completed


Tags

  • religious


@Mentions:

WPF Engineering

Electrical-Engineering

Burgess Concrete Construction

Concrete-Contractor


Worked on this project?

Add it to your portfolio