LEED

Project Activity Posts

Metro Health Hudsonville Finished

Posted by: WPF Engineering | Sep, 23rd

Project: Metro Health Hudsonville

Metro Health Hudsonville opened in the Spring of 2009.  WPF was responsible for the lighting design as well as power and fire alarm design. 

Photo for project
Read more about this Project

Metro Health Allendale Finished

Posted by: WPF Engineering | Sep, 23rd

Project: Metro Health Allendale

WPF Engineering was involved with three portions of the this project.  Metro Health's fitout for medical offices  has been submitted for LEED Commercial Interiors certification.  WPF also did the electrical engineering for the Core & Shell and also for the Orthodontist fitout in the building.  WPF Engineering was resposible for the power, emergency, lighting, fire alarm and site power/lighting.

Photo for project
Read more about this Project

Barnes & Thornburg LLP Completed

Posted by: WPF Engineering | Sep, 23rd

Project: Barnes & Thornburg LLP

WPF Engineering provided lighting design and electrical engineering for this high end tenant fit out.  9th and 10th floors of the City Bank building in downtown Grand Rapids were renovated as office, conference space and lobby spaces. 

Designed to LEED silver certification for commericial interiors this space achieved a reduction of lighting density by 25% while still achieving a dramatic lighting affect.  In addition controllability of lighting systems point was achieved by allowing all employees to control lighting level in their space to further reduce energy and provide comfort to occupants.

Photo for project
Read more about this Project

True North Building Finished

Posted by: WPF Engineering | Sep, 23rd

Project: True North Building

WPF Engineering is providing MEP LEED schematic design for Dewey office building located in furniture renaissance zone in Grand Rapids.  The brick and timber building will be renovated adding a new third floor.  It will be LEED certified for core and shell showcasing alternative energy and energy efficiency.  Engineering design will be provided for design build construction and LEED documentation. 

The following LEED points will be designed for this core and shell project.  Optimization of energy, reduction of water, Renewable energy using photovoltaics and wind power, measurement and verification of tenant spaces.

Photo for project
Read more about this Project

Projects

The Grand Rapids Ballet Company

Grand Rapids, Michigan

Electrical-Engineering

True North Building

Grand Rapids, Michigan

Engineering

Barnes & Thornburg LLP

Grand Rapids, Michigan

Electrical-Engineering

Metro Health Allendale

Allendale, Michigan

Electrical-Engineering

Metro Health Hudsonville

Hudsonville, Michigan

Electrical-Engineering