Harvest Bible Chapel - Auditorium and Gym Addition

Elgin, Illinois

Electrical-Engineering

Story

Goss/Pasma Blomquist Architects contracted with Lynn Surdock first at Design Plus and then moved with her to WPF Engineering.  This project was an addition of a 6500 seat auditorium and associated sound/video editing spaces, gym, dining space, lobby, gathering spaces and classrooms.  The gym was completed in phase two of the project.  The Dining space is not yet finished out.

Project required close coordination with A/V contractor for the auditorium and video/sound editing spaces.  Project was followed through CA phase.

Facts

  • Title: Harvest bible chapel - auditorium and gym addition
  • Location: Elgin, illinois
  • Postal code: 60123-3001
  • Phase: Complete
  • Delivery method: Design-bid-build
  • Budget: $63 million
  • Size: 210000.0


Project Identification Number:

PP-CST-A3EE-A679-34D6-DF60-0


Status: Completed


Tags

  • religious


@Mentions:

WPF Engineering

Electrical-Engineering


Worked on this project?

Add it to your portfolio