Owosso River Trail

Owosso, Michigan

General-Contractor

Story

Wolverine completed over the Shiawassee River a 900 foot long elevated wooden boardwalk. It was installed from Washington Street to Oakwood. 
A historic wrought iron bridge was also be renovated into a pedestrian crossing as the trail connects to the Harmon Partridge Park.    

Facts

  • Title: Owosso river trail
  • Location: Owosso, michigan
  • Phase: Complete
  • Budget: $940,000


Project Identification Number:

PP-CST-75B5-D06C-F630-27FE-0


Status: Completed


Tags

  • parks-&-recreation
  • parks-trails


@Mentions:

Wolverine Building Group

General-Contractor


Worked on this project?

Add it to your portfolio