Fort Myers, Florida
Construction-Management
Removed 1000 gallon fiberglass underground diesel tank
Worked with environmental consultant to test soil around existing underground tank for possible contamination, following DEP’s “Storage Tank System Closure Assessment Requirements”
Removed contaminated soil and backfilled with clean
Installed an above ground diesel tank and connected to backup generator
Tested all fuel lines
Installed a 6 ft. high chain link fence around new tank following NFPA requirements
Worked with environmental consultant in submitting the closure assessment report to the county
PP-CST-D4AF-DC8C-B39F-E7AF-0
Status: Completed