Bayside Boardwalk

Dollar Bay, Michigan

General-Contractor-Design/Build

Story

Originally designed to handle the mooring of coal barges and tugs, the Bayside Boardwalk is a conversion of an industrial site into a private residential boat dock. Moyle Construction reused the existing metal sheet piling as the base for the new dock. Using cantilevered cast-in-place concrete pads, a new dock was created. Rough sawn timber planks provide cushion and pedestals with hook-ups for power and water allow residents to maintain their boats right on site.

Facts

  • Title: Bayside boardwalk
  • Location: Dollar bay, michigan
  • Postal code: 49922
  • Phase: Complete
  • Delivery method: Design-build
  • Budget: $200,000
  • Size: 750.0


Project Identification Number:

PP-CST-71DB-F40F-1511-E91A-0


Status: Completed


Tags

  • specialty-site-work
  • other
  • site-work


Project Credits:

Moyle, Inc.

General-Contractor-Design/Build


Worked on this project?

Add it to your portfolio