Mateco Drilling

Grand Rapids, Michigan

Project Activity Posts

Environmental Site Finished

Posted by: Mateco Drilling | Sep, 23rd

Project: Environmental Site

Freeport, Illinois Environmental Site

  • Double cased wells into bedrock
  • Rock coring and large diameter hole rock drilling
  • Geophysical testing in rock
Read more about this Project

Cleveland International Airport Completed

Posted by: Mateco Drilling | Sep, 23rd

Project: Cleveland International Airport

Horizontal Extraction Wells Under Runways

  • Installation of three horizontal wells in subbase below concrete runways to drain contaminated groundwater
  • Concrete coring was performed to penetrate various thicknesses of concrete followed by well installations utilizing Geoprobe direct-push technology
Read more about this Project

Wood River Refinery Deep Drilling Program, St. Lous, MO Completed

  • 450 ft. borings
  • Wireline rock coring
  • Pump-in permeability testing
  • Borehole alignment with slope inclinometer
Read more about this Project