Environmental Site Finished

Posted by: Mateco Drilling | Jul, 24th

Project: Environmental Site

Freeport, Illinois Environmental Site Double cased wells into bedrock Rock coring and large diameter hole rock drilling Geophysical testing in rock

Read more about this Project

Cleveland International Airport Completed

Posted by: Mateco Drilling | Jul, 24th

Project: Cleveland International Airport

Horizontal Extraction Wells Under Runways Installation of three horizontal wells in subbase below concrete runways to drain contaminated groundwater Concrete coring was performed to penetrate various thicknesses of concrete followed by well installations utilizing Geoprobe direct-push technology

Read more about this Project

Wood River Refinery Deep Drilling Program, St. Lous, MO Completed

450 ft. borings Wireline rock coring Pump-in permeability testing Borehole alignment with slope inclinometer

Read more about this Project

Completed work on US-131 S-Curve

Posted by: Mateco Drilling | Jul, 24th

Project: US-131 S-Curve

Geotechnical drilling, wireline rock coring Drilling on barge Multiple drill rigs for fast pace project

Read more about this Project

Finished work for DeVos Place

Posted by: Mateco Drilling | Jul, 24th

Project: DeVos Place

Geotechnical rock drilling Pump-in permeability testing in rock Environmental drilling Low clearance drilling in tight areas

Read more about this Project