Greystone constructed two (2) new duplex housing units and one (1) single family unit designed by David Linner Architects for Greentree Development Corp. in Jordan, Minnesota. Each of the three buildings is on a separate lot. Each unit features:  

-        Maintenance free siding

-        Maintenance free deck & railings

-        Lawn irrigation system

-        Gypcrete floor topping

-        FEMA storm shelter room

Greystone completed the finish carpentry work on all three units with its own workforce.

The project was a general construction project and was completed in 4 months.

Facts

  • Title: Chad pointe
  • Location: Jordan, minnesota
  • Phase: Complete
  • Delivery method: Design-bid-build
  • Size: 5.0


Project Identification Number:

PP-CST-338C-3286-9246-A68B-0


Status: Completed