Michigan Turkey Producers

Grand Rapids, Michigan

Electrical-Contractor

Story

The System Engineering group designed and installed an electrical system and process controls to accommodate new operations at the existing Michigan Turkey Producers facility. The project was fast-tracked with a tight schedule that required continual design modifications during the construction process. Facility engineering of the plant required incorporating and relocating the existing process machinery, while redistributing the associated power systems. The engineering of the process controls included the use of SCADA technology, which allows the client to maximize production and efficiency.

Facts

  • Title: Michigan turkey producers
  • Location: Grand rapids, michigan
  • Postal code: 49503
  • Phase: Complete
  • Size: 92000.0


Project Identification Number:

PP-CST-8591-4CE8-9182-84E9-4


Status: Completed


Tags

  • food-/-pharmaceutical-plant
  • industrialmanufacturing
  • system-engineering


@Mentions:

Dan Vos Construction Company

General-Contractor-Design/Build

Classic Engineering

structural-engineering

Exxel Engineering

Civil-Engineering

Steel Systems Inc

Structural-Steel-Fabrication

Feyen Zylstra, LLC

Electrical-Contractor

Soils & Structures, Inc.

Construction-Materials-Testing


Worked on this project?

Add it to your portfolio