In 2002, Ada Christian Schools built a new K-8 facility.The design included classrooms, a media center, a gymnasium, science labs, a computer lab, and administrative offices. Feyen Zylstra’s scope of workincluded electrical, fire alarm, clocks, security, paging, as well as voice and data cabling andtelephone system. Because the school was awarded a grant from the Van Andel Institute, FeyenZylstra worked closely with the representatives from the Institute to design technology systems to meet their specific needs. The schedule was fast-tracked to complete the school in only 10 months.

Facts

  • Title: Ada christian school
  • Location: Ada, michigan
  • Postal code: 49301
  • Phase: Complete
  • Size: 88000.0


Project Identification Number:

PP-CST-283A-FFA2-C392-990C-6


Status: Completed


Tags

  • education
  • educationalinstitutional
  • electrical-construction
  • low-voltage-systems
  • communications
  • energy-management-systems
  • featured-projects


@Mentions:

Dan Vos Construction Company

General-Contractor

Exxel Engineering

Civil-Engineering

Twin Lakes Nursery

Landscaping

Steel Systems Inc

Structural-Steel-Fabrication

Driesenga & Associates

Material-Testing

Feyen Zylstra, LLC

Electrical-Contractor

ASCOM, Inc.

Audio-Visual-Installation

Van Dyken Mechanical, Inc.

HVAC-Contractor


Worked on this project?

Add it to your portfolio